2013年11月4日 星期一

Ground reference high temperature send + waters to warm: the most appropriate heating techniques - ground supply heat pump, warming - Business

heat knock out network hc your institution with beijing terrain source temperature knock out air conditioning venture winter running arena test confirmed " solar electrical power + floor origin warm knock out + mineral water in order to warm, "is the perfect warming system. project summary the task handles an area with 71,322 square meters regarding full planning, which include considering of design land part of 57,332 rectangular meters, complete creating division of 35,800 square meters, in the most important plus secondary institution buildings, laboratory building, a smallish hall, condominium buildings, canteens , stadiums and also buildings or maybe developing component. employ ground-source warmth with the project pump motor procedure for all buildings with sizzling and also frosty end of the actual electrical power release program resources, additionally sports, lecturers and canteen apartments, each one setting up exclusively in winter weather home heating warmth and chilly origin method won't require summer. design and style with soil origin heat pump method provides 7 ~ twelve inside summer months perfectly chilled water with winter weather to provide 45 ~ 40 air flow conditioning, heating and also popular water. the actual project ground form heating pump program cooling design fill 5892kw, this challenge yard reference heat pump technique energy design and style insert 2499.84kw. that project of helping buildings, pupil dormitories, lounge as well as gym by using drinking water to be able to warm, professors quarters, canteen work with fan coil device , sporting activities fan coil as well as total temperature exchange along with surroundings demanding fitness units. the venture of metro pipe system endothermic heat place inside wintertime related to 1875kw, bustling place within the summer months load with about 707kw. commissioning from the project in winter field rank in addition to examination associated with the specific sit uation 1, debugging as well as going discipline examination the particular challenge on march 25, 3 years ago begin debugging along with running, ground recycled drinking water secure heat range 13.6 , 11 a single debugging is definitely completed, and also began to be able to heat buildings. 30 days soon after commissioning, the procedure procedure status as follows: 2007 5 to 12-15 december, a couple servers to perform four hours later, laid to rest subterranean high temperature exchanger that temperatures of related to 3 or more , the actual temp is around 7 , right now there to be able to secure their unique frosty shutdown units, in that case the completed from the temp about 32 , the particular temps will be twenty eight , the area heat can certainly connect with the pattern requirements. 2007 of sixteen to be able to 20 december, a pair of hosts to run 3 hours, the subterranean heating exchanger heat range connected with about several , the heat range is 6.5 or so, th ere's lower temp unit to guard independantly down, then conclude with the heat connected with 30 , the actual temp around 26 , then give the the wind fan coil heat range regarding lower than design requirements, low temperature water radiant floor warming up part of the bedroom temps could not really get to design requirements. 2007 12 thirty-one debugging observed that will not one but two owners could not open normally, lastly by increasing the particular ground water flow high temperature exchanger, two heating pumps host can run related to three or more hours, undercover heat exchanger your temperature of about 3 , your temperature of related to some , regarding a few days, gadgets associated with low-temperature shutdown defense of their own, next the finish on the temperatures about 27 , the actual temps all around 23 , the particular place temperature can definitely not become meet the planning requirements. 2008 1 5, a new temperature pump motor through the opening, even though conditioning out of as well as the carpeting / flooring will not utilize room, that availabilit of sub-periods and also useful condominiums canteen (noon and also evening) along with classroom building, smothered underground during this time around for the temperature of warm is about 3.5 , the heat is around 6.7 , the finish with the temperature all-around 32 , the average water heat range is actually 28 , the room temperature will be improved. similar reading: vitality helpful ground origin heat pump cooling warming up engineering urumqi to encourage soil source temperature pump technologies u.s. soil resource warm send is with the spouse and children in order to private building



???????

沒有留言:

張貼留言